PPT Slide
IO interconnection and packaging in a large system
Large system IO as function of gates per chip follows Rents rule (IO/k)1.8 = number of gates
Gates per chip in millions
High performance multi-chip module
k=0.1 for frame (six shelves max)
k=0.2 for shelf (ten PCBs max)
k=0.3 for PCB (four HPMCM max)
k=0.4 for HPMCM (ten ICs max)
I/O terminals required (thousands)
J. Lightwave Technol. 10, 811 (1992)
Conventional economies of scale and system diversity drive multi-chip solution